Investment

What the sources say

Decree 45 of 2026, published in full by SANA on 6 April, created SEC as a wholly state-owned public holding company attached to the Energy Minister. [1]

Scope & conditions: Under the reviewed text; verify project eligibility and sector approvals with the competent authority.

The company succeeds the public generation and transmission/distribution institutions and their subsidiaries in the rights and obligations specified by the text. [1]

Scope & conditions: Under the reviewed text; verify project eligibility and sector approvals with the competent authority.

Its duties include coordinating investment areas with the Ministry, preparing contracts and establishing subsidiaries or joint companies; the text requires environmental impact assessment with competent authorities. [1]

Scope & conditions: Company powers are not a general licence for a private plant or a guarantee that its output will be purchased.

What you can prepare

Practical preparation suggestions, not a mandatory document list or a substitute for the authority’s requirements.

  • Preparation: identify generation, equipment supply or services.
  • Define capacity, location and land-use rights.
  • Confirm the current licensing, connection and contracting bodies.
  • Check grid studies and fuel or renewable resources.
  • Obtain power-purchase and payment terms for any official offer.
  • Review environmental impact and financing before committing.

Questions before you decide

Questions to verify your circumstances with the relevant authority, not assumptions of approval or exemption.

  1. What is the Syrian Electricity Company?
  2. Is there a guaranteed solar power purchase price?

Check the original sources

Every fact in this guide is linked to a source. A news publication date alone does not establish when a legal rule takes effect.

  1. Legal text

    [1] نص المرسوم 45 لعام 2026 بإحداث الشركة السورية للكهرباء

    رئاسة الجمهورية العربية السورية / سانا

    Source publication date
    Legal instrument date
    Not established in this record
    Stated effective date
    Not established in this record
    Open original source ↗

Questions & answers

Questions about this topic

Answers tied to specific sources. Read the legal status and references before applying an answer to your situation.

Matching questions: 3

I have old correspondence with an electricity body; how do I confirm the current contracting party?

Provide the correspondence, contracts and references and request confirmation of who now holds those specific rights and obligations. Institutional restructuring alone does not identify every authorised signatory or settle an earlier application’s status.

Status and scope of the information: These are practical preparation suggestions, not a mandatory document list or additional official conditions. The source establishes context; the responsible authority determines application requirements.

Sources & references

Answer reviewed:

Continue this question with Yazan
How should I model a power project before an electricity-purchase agreement exists?

Use separate price, demand, grid-connection and commissioning scenarios, clearly labelled as assumptions. Record the missing purchase agreement and financing implications. An institution’s contracting powers are not evidence of a commitment to buy your project’s output.

Status and scope of the information: These are practical preparation suggestions, not a mandatory document list or additional official conditions. The source establishes context; the responsible authority determines application requirements.

Sources & references

Answer reviewed:

Continue this question with Yazan
What preliminary environmental information is useful for a power-generation proposal?

Identify the site, technology, fuel or resource, water needs, waste streams and expected emissions. Note nearby communities and existing studies. These support initial discussion but do not replace the environmental assessment required by the competent bodies.

Status and scope of the information: These are practical preparation suggestions, not a mandatory document list or additional official conditions. The source establishes context; the responsible authority determines application requirements.

Sources & references

Answer reviewed:

Continue this question with Yazan
All guides ↗