Investment

What the sources say

The Ministry adopted a new industrial-cities investment system on 18 June 2025; its later announcement identifies it as Decision 432 of 2025. [1] [2]

Scope & conditions: Subject to the reviewed text and project conditions; confirm application with the competent authority.

Under the announced system, experts assess plot prices annually and a ministerial decision sets them. An old plot price therefore cannot establish current prices across all cities. [1]

Scope & conditions: Subject to the reviewed text and project conditions; confirm application with the competent authority.

On 20 April 2026 a decision was announced regularising specified building permits under earlier systems, including one renewal of expired permits for one and a half years from the decision date. [2]

Scope & conditions: Only for cases covered by that decision; it is not a universal term for new permits, and expiry is not calculated from the news date alone.

What you can prepare

Practical preparation suggestions, not a mandatory document list or a substitute for the authority’s requirements.

  • Preparation: select the city, industry and required area.
  • Ask the administration for current availability and price decision.
  • Request payment, allocation and withdrawal terms.
  • Verify power, water, access and service capacity.
  • Review building rules and construction/operating permits.
  • For older permits, confirm whether the 2026 regularisation applies.

Questions before you decide

Questions to verify your circumstances with the relevant authority, not assumptions of approval or exemption.

  1. What is the current plot price in Adra or Hassia?
  2. Does the 2026 permit decision cover my project?

Check the original sources

Every fact in this guide is linked to a source. A news publication date alone does not establish when a legal rule takes effect.

  1. Official announcement

    [1] إقرار نظام الاستثمار بالمدن الصناعية في سوريا

    وزارة الاقتصاد والصناعة / سانا

    Source publication date
    Legal instrument date
    Not established in this record
    Stated effective date
    Not established in this record
    Open original source ↗
  2. Official announcement

    [2] تنظيم وتسوية رخص البناء للمستثمرين في المدن الصناعية

    وزارة الاقتصاد والصناعة / سانا

    Source publication date
    Legal instrument date
    Not established in this record
    Stated effective date
    Not established in this record
    Open original source ↗

Questions & answers

Questions about this topic

Answers tied to specific sources. Read the legal status and references before applying an answer to your situation.

Matching questions: 3

How should I compare two industrial-plot offers when one quotes an old price?

Request the price date, authorising decision, included services, fees and payment terms. Compare documented total cost, not only price per square metre. An old quote does not establish the current price in that or another industrial city.

Status and scope of the information: These are practical preparation suggestions, not a mandatory document list or additional official conditions. The source establishes context; the responsible authority determines application requirements.

Sources & references

Answer reviewed:

Continue this question with Yazan
What should I check before buying an existing facility in an industrial city?

Gather the seller’s rights, building permits, renewals, plans and actual facility condition. Separate building status from operating permission and equipment ownership. Identify any case-specific regularisation instead of assuming a general announcement resolved every building.

Status and scope of the information: These are practical preparation suggestions, not a mandatory document list or additional official conditions. The source establishes context; the responsible authority determines application requirements.

Sources & references

Answer reviewed:

Continue this question with Yazan
How can I assess whether an industrial plot suits my production line?

List power, water, drainage, access and expansion needs. Ask the city administration about availability, cost and timing, distinguishing existing services from planned ones. Include connection costs and possible delays when comparing sites.

Status and scope of the information: These are practical preparation suggestions, not a mandatory document list or additional official conditions. The source establishes context; the responsible authority determines application requirements.

Sources & references

Answer reviewed: