A contractor's much lower bid may omit essential work or assume different specifications. Before comparing prices, give bidders the same scope and ask them to identify exclusions. A useful comparison does not choose the contractor for you; it shows what you would actually buy and which technical or contractual questions remain unanswered.

Standardise quantities and specifications

Break the work into inspectable items: preparation, construction, installations, testing and handover. State the unit, quantity, specification and material supplier for each. Ask bidders to price the same schedule and show alternatives separately. A unit price with unclear specifications cannot be compared directly with a lump sum that includes extra work. Have an engineer explain differences before scoring the offers.

Make exclusions visible in the total cost

Add columns for excluded work and for delivery, storage, cleanup, permissions and testing that require clarification. Do not invent charges; establish who bears them and how they are calculated. Record currency, validity and change-control arrangements, then compare monthly cash requirements. Similar total prices can hide very different pressure on startup liquidity when advance payments or materials commitments differ.

Assess delivery capacity with evidence

Review comparable projects, the delivery team, resource schedule and supervision method, with checkable references. Define who accepts work, what records demonstrate completion and how defects are recorded and reinspected. Have responsibility, delay and warranty terms professionally reviewed. Keep a written selection rationale covering technical fit, scope clarity, delivery capacity and price rather than a personal impression or an unsupported promise of speed.

Preparation worksheet

  • One quantity and specification schedule.
  • An exclusions list for each contractor.
  • Clear currency, validity and payment schedule.
  • Verifiable delivery references.
  • Acceptance criteria and defect register.
  • A documented selection rationale.

Questions about this decision

Should I reject the cheapest bid?

No. Understand the difference and confirm comparable scope and specifications. Genuine efficiencies may lower cost, but omissions or insufficient resources can later become paid changes and delays.

How do I compare lump-sum and measured-work offers?

Identify common work, quantity assumptions and treatment of increases or reductions. Ask an adviser to explain the pricing model; do not place differently based totals in one column without qualification.

Related legal sources

These facts come from the existing legal library and do not constitute project approval. The source review date differs from this article’s publication date.

Contracts and civil liability: prepare an evidence-based legal question

A September 2026 Justice Ministry commentary distinguishes contractual liability and discusses fault, damage and causation.

General official commentary, not a ruling on your contract or a consolidated code.

Source reviewed:

Open the official source

Read the source guide and conditions ↗

Preparing an Investment Authority file for legal and financial review

On 19 January 2026, the Authority announced specialist offices to assess submitted projects legally and financially.

The offices’ existence does not prove that a particular project was accepted or reviewed.

Source reviewed:

Open the official source

Read the source guide and conditions ↗