The lowest supplier price can become the highest cost by the time goods reach your project. Compare scope before comparing totals. ICC explains that Incoterms® rules allocate costs, risks and obligations between buyer and seller; they do not change tariff rates themselves. Use the official reference and qualified review to establish the boundary of each quotation.

Specify place, edition and included scope

If a rule is used, request its name, precise place and agreed edition, followed by clear inclusions for packing, loading, transport, insurance and formalities. A three-letter abbreviation without context is insufficient. Distinguish the cost boundary from the risk-transfer point under the selected rule. Ask a specialist whether it suits the actual transport arrangement rather than copying a term from an unrelated old deal.

Bridge the quoted price to the project cost

Create a row for each cost outside the supplier's offer, identifying who estimates it and quote validity. Separate confirmed prices from amounts needing customs classification, inspection or local services. Do not apply one assumed duty rate to all equipment; prepare specifications for Yazan or a specialist to frame the right enquiry. Include installation and commissioning: arrival at a delivery point is not production readiness.

Review payment and acceptance separately

Even with a clear delivery term, agree currency, payment timing, specifications, acceptance, warranty and discrepancy handling. Obtain one final consolidated offer rather than relying on scattered messages with different figures. Recalculate when quantity, route or delivery place changes. Keep assumptions with the purchase decision so accounting and operations understand what was bought and which tasks remain outside the supplier's scope.

Preparation worksheet

  • Comparable goods, specifications and quantities.
  • Precise place and edition for any selected rule.
  • Documented included and excluded costs.
  • Professionally reviewed risk-transfer point.
  • Separate payment, acceptance and warranty terms.
  • Total through commissioning, with estimates labelled.

Questions about this decision

Does a delivery term tell me the tariff rate?

No. ICC states that the rules allocate responsibilities rather than determine tariff rates or customs procedures. The product still needs appropriate classification and import context, with applicable provisions checked.

Is the higher quotation always less competitive?

It may include work or coverage excluded elsewhere. Align cost boundaries, quality and timing first, then compare total exposure rather than selecting the smallest number on the first page.

Related legal sources

These facts come from the existing legal library and do not constitute project approval. The source review date differs from this article’s publication date.

Importing machinery into Syria: customs exemption routes

Amended Article 20 exempts machinery and production-line imports for investment establishments, registered in the name of a licensed investment project, from customs and financial duties and non-customs additions.

The project licence and registration in its name are essential; machinery imported for resale is not automatically exempt.

Source reviewed:

Open the official source

Read the source guide and conditions ↗

Contracts and civil liability: prepare an evidence-based legal question

A September 2026 Justice Ministry commentary distinguishes contractual liability and discusses fault, damage and causation.

General official commentary, not a ruling on your contract or a consolidated code.

Source reviewed:

Open the official source

Read the source guide and conditions ↗

Method references