Buying panels and batteries is not enough to establish a solar installation company. An investor in Syria needs a customer definition and service scope: supply only, or design, installation and maintenance. This guide addresses business organisation, not electrical design or a substitute for qualified engineering and relevant approvals.
Define the deliverable
Use an assessment sheet for customer requirements, site conditions and work scope, then have a qualified person specify the design. Distinguish equipment ratings from expected service under written assumptions. Keep specifications, serial numbers and handover records so another technician can understand the installation later.
Separate warranty responsibilities
Obtain the manufacturer’s warranty in writing and distinguish your installation, response and replacement commitments. Cost diagnostic visits, transport and waiting for replacement parts. Do not promise unlimited coverage or a fixed response time before testing your team and supplier network.
Test recurring-service economics
Pilot a limited project and record labour, follow-up visits, faults and causes. Create a clearly scoped maintenance offer rather than burying every cost in equipment sales. Keep separate equipment and service accounts to see which activity consumes working cash or technician time.
A worksheet for the decision
Keep an installation file with scope, design approval, serial numbers, supplier warranty, handover and service visits. Log each visit’s time, cause and parts. Compare estimated and actual support costs before repricing or advertising maintenance plans, leaving technical review to the responsible specialist.
Preparation worksheet
- Define supply and service scope.
- Use qualified design and safety review.
- Keep written supplier warranties.
- Price diagnostic visits.
- Review pilot results.
Questions about this decision
Can savings be guaranteed for every customer?
Do not generalise one project’s result. Loads, usage, location and prices differ; obtain documented engineering and financial assumptions before making a commitment.
What should I track first?
Track service hours and visits per installation after handover. This may reveal that a sale appearing profitable needs a different maintenance price.
Related legal sources
These facts come from the existing legal library and do not constitute project approval. The source review date differs from this article’s publication date.
Electricity investment in Syria: the Syrian Electricity Company role
Decree 45 of 2026, published in full by SANA on 6 April, created SEC as a wholly state-owned public holding company attached to the Energy Minister.
Under the reviewed text; verify project eligibility and sector approvals with the competent authority.
Source reviewed:
Read the source guide and conditions ↗Contracts and civil liability: prepare an evidence-based legal question
A September 2026 Justice Ministry commentary distinguishes contractual liability and discusses fault, damage and causation.
General official commentary, not a ruling on your contract or a consolidated code.
Source reviewed:
Read the source guide and conditions ↗